In July 2020:
- long preparation for the installation of panoramic elevators;
- the installation of aluminum elevator structures continued;
- installation of aluminum structures of the SPA-zone at the level of 1, 2, 3 sections and boiler room continued;
- development of marks on improvement of the territory was carried out;
- finishing works of the number fund continued.