Construction progress of LIFE STORY - April 2021 - LEV Development

Construction progress of LIFE STORY – April 2021

May 2021
21

In April 2021:

  • Concreting of vertical structures of the basement (walls and pylons) at the mark -4.55 in the second section was completed;
  • Performed 50% concreting of vertical structures (walls, pylons) of the 1st floor in the second section;
  • Finished the pile field in the first section.
/