PERFECT LIFE CONSTRUCTION PROGRESS – SEPTEMBER 2022

October 2022
05

In September 2022:

  • The installation of columns and floor slabs on the 5th-6th floors has been completed;
  • The columns of the 7th floor are arranged;
  • Reinforcement of the floor slab above the 7th floor continued.
/