Construction progress of LEV CITY HOTEL – November 2021

November 2021
30

At the end of November 2021:

  • Installation of fiber cement boards on the ventilated facade proceeds;
  • We continue to putty walls and ceilings on the 3rd and 7th floors;
  • Armstrong ceilings have been installed in the bathrooms and corridors of the rooms;
  • We put ceramic tiles in the bathrooms;
  • Completed the installation of the frame of the suspended ceiling of plasterboard on the ground floor;
  • We install ceramic tiles in the bathrooms;
  • Installation of the air conditioning system continues.
/