In October 2020:
- The masonry of the outer walls of the 4th floor has begun.
- Work on laying the walls of the 7th floor continued.
- Installation of ventilation ducts continued.
- Roof insulation has started.
- The masonry of the 7th floor walls has been completed.
- The masonry of the 5th and 6th floor ceramic blocks continued.
- Installation of ventilation ducts continued.
- Flooded screed on the roof
- The masonry of the 6th floor walls has been completed.
- The brick walls on the 5th floor continued to be built.
- Installation of ventilation ducts continued.
- Work on waterproofing the roof continued.