Construction progress of LEV CITY HOTEL – October 2020

November 2020
05

In October 2020:

  • The masonry of the outer walls of the 4th floor has begun.
  • Work on laying the walls of the 7th floor continued.
  • Installation of ventilation ducts continued.
  • Roof insulation has started.
  • The masonry of the 7th floor walls has been completed.
  • The masonry of the 5th and 6th floor ceramic blocks continued.
  • Installation of ventilation ducts continued.
  • Flooded screed on the roof
  • The masonry of the 6th floor walls has been completed.
  • The brick walls on the 5th floor continued to be built.
  • Installation of ventilation ducts continued.
  • Work on waterproofing the roof continued.