In December 2020:
- A cornerstone was laid;
- Flooded preparation for the foundation of the tower crane;
- Reinforced the frame under the foundation of the tower crane;
- The foundation under the crane was concreted;
- Concreted supports for the tower crane;
- Tests of piles were performed.