Станом на липень 2026 року:
As of July 2026 :
In Section V:
- The apartments are numbered;
- Cleaning work is being carried out in public areas;
- Patio area fencing has been installed.
In Section VI:
- The installation of ventilation ducts in the parking lot has been completed;
- The columns in the parking lot have been painted;
- Patio area fencing installed;
- The door structure of the elevator vestibule in the parking lot has been installed.
In Section VII:
- Paving has been completed;
- The installation of ventilation ducts in the parking lot has been completed;
- The columns in the parking lot have been painted;
- Installation of railings on staircases and landings is underway;
- The door structure of the elevator vestibule in the parking lot has been installed.
In Section VIII:
- The paving stones at the entrance have been completed;
- Installation of railings on staircases and landings is underway;
- Installation of lighting fixtures in public areas has begun.