Construction progress of the PERFECT LIFE – January 2026 - LEV Development (Лев Девелопмент)

Construction progress of the PERFECT LIFE – January 2026

January 2026
21

As of January 2025 :

Section V:

  • The cable to the electrical panel has been laid;
  • Installation of electrical cabinets in the electrical switchboard has begun.

Section VIII:

  • Electricity metering cabinets have been installed on the floors.

Section IX:

  • Installation of electrical cabinets in the electrical panel room has begun;
  • Installation of MDF linings above the entrance doors to apartments has begun.
/