As of January 2026:
- Section A2: A pit was developed and concrete preparation was carried out for the foundation of the house;
- Section A3: We designed a pit and arranged concrete preparation for the foundation of the house;
- Section A4: The excavation has been designed. And 50% preparation has been arranged;
- Section A5: Work has begun on the development of the excavation pit.