PERFECT LIFE CONSTRUCTION PROGRESS - OCTOBER 2022[:] - LEV Development (Лев Девелопмент)

PERFECT LIFE CONSTRUCTION PROGRESS – OCTOBER 2022

November 2022
07

In October 2022:

  • The floor slab above the 7th floor is arranged;
  • Arranged columns and floor slab on the 8th floor;
  • Parapets are arranged in the I section;
  • The installation of the pillow under the foundation slab of the II section has begun.
/