SILENT PARK CONSTRUCTION PROGRESS – November 2022

December 2022
11

In November 2022:

House 1:

  • The arrangement of the walls and columns of the 4th floor has been completed;
  • The floor slab of the 4th floor is concreted;
  • The walls, columns and ceiling of the 5th floor are arranged;
  • The waterproofing of the 1st floor has been arranged.

House 2:

  • The walls and columns of the 2nd floor have been installed;
  • The covering of the -2nd floor has been completed.
/