In November 2022:
House 1:
- The arrangement of the walls and columns of the 4th floor has been completed;
- The floor slab of the 4th floor is concreted;
- The walls, columns and ceiling of the 5th floor are arranged;
- The waterproofing of the 1st floor has been arranged.
House 2:
- The walls and columns of the 2nd floor have been installed;
- The covering of the -2nd floor has been completed.