In November 2022:
- The pillow of the II section of the 2nd entrance was placed on the foundation;
- The monolithic walls and columns of the II section of the parking lot of the 2nd entrance were installed;
- A floor slab has been installed over the parking lot of the II section of the 2nd entrance;
- A pit was dug for the foundation of the II section of the 1st entrance;
- We proceed to the reinforcement of the foundation pillow.